Nanjing, epoxy floor, epoxy floor
rete surface should not have severe trachoma, and oil cavity; Construction of suitable temperature: 5 ℃ to construction temperature 40 ℃; The moisture content of less than 5% relative humidity should be less than 75%; Primary moisture treatment of concrete to be done (except floor); Requirements of grass-roots ideal flatness (flatness of its direct impact). Construction Technology: Basic ground handling; Brushing epoxy sealing primer; Scraping and epoxy putty in the coating; Polished, clean pr
3/4 صفحة الآتي صفحة السابقة الصفحة الرئيسية صفحة النهاية
عودة
التجديد
WAP الرئيسية
طبعة الموقع
الدخول
09/03 05:51