Notice: Undefined index: group_show in /home/www/html/ar.liang360.net/html/wap/sell.inc.php on line 16 LED production equipment|التزويد|ar.liang360.net|Powered By Destoon
الصفحة الرئيسية التزويد التجديد عودة الدخول
LED production equipment
ld for the formation of the first spherical end must be treated (with negative electron pressure of the machine into a ball), and the metal surface before welding the preheating; then gold ball at the time and pressure together, the metal welding deformation of the surface of moon, so that the two media to achieve a reliable contact and friction by ultrasonic vibration, the two atomic affinity between the metal atoms the formation of metallic bonds under the effect of realized gold wire welding.

2/9 صفحة الآتي صفحة السابقة الصفحة الرئيسية صفحة النهاية

التزويد


عودة التجديد WAP الرئيسية طبعة الموقع الدخول
09/04 12:06